logo
Startseite ProdukteEpoxy Powder Coating

3 PP Three-layer structure polyolefin epoxy powder coating

Alle Produkte

Valve

(19)

Steel Pipe

(340)
Bescheinigung
China Sindara Steel Co.,Ltd zertifizierungen
China Sindara Steel Co.,Ltd zertifizierungen
Ich bin online Chat Jetzt

3 PP Three-layer structure polyolefin epoxy powder coating

3 PP Three-layer structure polyolefin epoxy powder coating
3 PP Three-layer structure polyolefin epoxy powder coating 3 PP Three-layer structure polyolefin epoxy powder coating 3 PP Three-layer structure polyolefin epoxy powder coating

Großes Bild :  3 PP Three-layer structure polyolefin epoxy powder coating

Produktdetails:
Herkunftsort: CHINA
Markenname: Sindara steel
Zertifizierung: ISO 9001, ISO 14001, ISO 45001, CE
Modellnummer: (Norm DIN 30678-2013)
Zahlung und Versand AGB:
Min Bestellmenge: 1Ton
Preis: 100USD-5000USD
Verpackung Informationen: Außenverpackung aus Karton, ausgekleidet mit Polyethylenbeutel
Lieferzeit: 10-30 Tage
Zahlungsbedingungen: L/c, t/t
Versorgungsmaterial-Fähigkeit: 1000000

3 PP Three-layer structure polyolefin epoxy powder coating

Beschreibung
Hervorheben:

Three-layer Polyolefin Epoxy Powder Coating

,

Polyolefin Epoxy Powder Coating

Description

 

3LPP (Standard DIN 30678-2013)

 

The epoxy powder coating is the implementation of DIN 30678-2013 standard, which is the bottom design of the three-layer structure of polypropylene in buried steel-made pipe, using appropriate epoxy resin, curing agent, pigment, filler, etc., and can form a composite anti-corrosion system with excellent performance with intermediate layer adhesive and outer polypropylene.

 

1. Application scope and characteristics

 

External anti-corrosion of steel pipe and pipe fittings.

Compared with other forms of anti-corrosion, it has the characteristics of good adhesion, strong cathode disbondment, and  collision and damage prevention.

It has the characteristics of mature process, wide application range, long anti-corrosion life, and wide operating temperature range (-20℃ ~100℃).

 

2. Method and dosage

 

1 Coating method: Electrostatic spraying.

2 Theoretical dosage: 150g/M2/100μm.

3 Surface treatment: Sandblasting or Pelblasting.

4 Curing instructions: Apply the powder coating on the surface of 200~220℃. When the powder coating forms a gelatinized state, the middle adhesive layer is squeezed and wound, so that the two layers are integrated into one, and then wrap the polypropylene layer, and finally form a complete three-layer coating structure.

 

3.Production Department

 

3 PP Three-layer structure polyolefin epoxy powder coating 0 3 PP Three-layer structure polyolefin epoxy powder coating 1 3 PP Three-layer structure polyolefin epoxy powder coating 2

 

 

4. Paking

 

3 PP Three-layer structure polyolefin epoxy powder coating 3 3 PP Three-layer structure polyolefin epoxy powder coating 4 3 PP Three-layer structure polyolefin epoxy powder coating 5

Kontaktdaten
Sindara Steel Co.,Ltd

Ansprechpartner: Mr. Sindara Steel

Telefon: 86-731-89698778

Faxen: 86-731-89695778

Senden Sie Ihre Anfrage direkt an uns (0 / 3000)